{"id":2410,"date":"2016-04-27T14:28:36","date_gmt":"2016-04-27T14:28:36","guid":{"rendered":"http:\/\/grupoimesapi.es\/IMESAPI\/?p=2410"},"modified":"2017-03-02T11:33:27","modified_gmt":"2017-03-02T11:33:27","slug":"plan-de-eficiencia-energetica-de-metro-madrid","status":"publish","type":"post","link":"https:\/\/www.grupoimesapi.es\/en\/plan-de-eficiencia-energetica-de-metro-madrid\/","title":{"rendered":"Energy Efficiency Plan for Metro Madrid"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_custom_heading text=&#8221;Description of the Project<br \/>\n&#8221; use_theme_fonts=&#8221;yes&#8221;][vc_separator][vc_column_text]A supply and installation contract, awarded to Imesapi in a UTE with Vimac, to replace a total of 56,000 traditional fluorescent tubes with their electronic equipment, for others based on LED technology with external driver and Zigbee wireless regulation system. With this change has achieved an energy savings of 69.34%, corresponding to 50,000 kWh \/ day, 19 million kWh per year, equivalent to what 5,800 households consume in a year in Madrid.<\/p>\n<p>The high level of satisfaction on the part of the customer, the experience gained, have made Metro de Madrid again trust in Imesapi, this time alone for the supply and installation of another 60 stations and four deposits (2 phases), with a total Of 56,000 fluorescent tubes and 1,500 industrial luminaires.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_custom_heading text=&#8221;Photo Gallery&#8221; use_theme_fonts=&#8221;yes&#8221;][vc_separator][vc_media_grid element_width=&#8221;2&#8243; item=&#8221;mediaGrid_FadeInWithIcon&#8221; initial_loading_animation=&#8221;flipInX&#8221; grid_id=&#8221;vc_gid:1488454266398-b847127f-7b18-10&#8243; include=&#8221;2910,2911,2912,2913,2914&#8243;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>First phase of energy efficiency plan for Metro to supply and installation of efficient lighting in stations and train depots.<\/p>\n","protected":false},"author":3,"featured_media":2915,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[55],"tags":[],"class_list":["post-2410","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-proyectos-instalaciones-y-servicios","description-off"],"_links":{"self":[{"href":"https:\/\/www.grupoimesapi.es\/en\/wp-json\/wp\/v2\/posts\/2410","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.grupoimesapi.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.grupoimesapi.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.grupoimesapi.es\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.grupoimesapi.es\/en\/wp-json\/wp\/v2\/comments?post=2410"}],"version-history":[{"count":0,"href":"https:\/\/www.grupoimesapi.es\/en\/wp-json\/wp\/v2\/posts\/2410\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.grupoimesapi.es\/en\/wp-json\/wp\/v2\/media\/2915"}],"wp:attachment":[{"href":"https:\/\/www.grupoimesapi.es\/en\/wp-json\/wp\/v2\/media?parent=2410"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.grupoimesapi.es\/en\/wp-json\/wp\/v2\/categories?post=2410"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.grupoimesapi.es\/en\/wp-json\/wp\/v2\/tags?post=2410"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}